Basic Info.
Model NO.
HJ9115
Material
Metal
WordPad Structure
Concealed
Style
Modern
Usage
Auditorium, Hall, Auditorium, Cinema, Station, Supermarket, Hosp
Size
L*W*H:480*280*780mm
Kind
Chair
MOQ
10PCS
Warranty
5 Years
Loading Port
Shenzhen or Guangzhou
Application
Auditorium, Theater,Oprea, College
Transport Package
Export Packing
Specification
ISO2001, ISO14001
Trademark
Hongji
Origin
China
HS Code
9401100000
Production Capacity
8000PCS/Month
Product Description
| PRODUCT DESCRIPTION |
Model No.: HJ9115
* Armrest: import oak wood
* Seat & back: cold molded injection polyurethane foam. Rear seat and back panel made of multilayer wood veneer
varnish finish.
* Writing tablet: ABS,with rotary mechnism made of aluminum
* Seat tip up mechanism: spring with damper, slow return without any noise.
* Footrest: steel electrostatic powder coating black finish.
* Arm center to center distance: 580mm.
*Layout ≥5 seats/ row
Our product range include auditorium chair, cinema chair, school desk and chair, office training table, staff chair,
public waiting chair etc.
Application: Auditorium room, home theater, leacture hall, hall room and etc.
* Armrest: import oak wood
* Seat & back: cold molded injection polyurethane foam. Rear seat and back panel made of multilayer wood veneer
varnish finish.
* Writing tablet: ABS,with rotary mechnism made of aluminum
* Seat tip up mechanism: spring with damper, slow return without any noise.
* Footrest: steel electrostatic powder coating black finish.
* Arm center to center distance: 580mm.
*Layout ≥5 seats/ row
Our product range include auditorium chair, cinema chair, school desk and chair, office training table, staff chair,
public waiting chair etc.
Application: Auditorium room, home theater, leacture hall, hall room and etc.
| Clothing | fabric or Pu leather, color optional | ||||||
| Center distance | 580mm | ||||||
| packing | knock down | ||||||
| CBM/seat | 0.16 m³ | ||||||
| Loading QTY | 20GP | 40HQ | |||||
| 160 PCS | 420PCS | ||||||
| MOQ | 10 PCS | ||||||
| Warranty | 5 years | ||||||
| Payment item | 30% as deposit, balance to be paid before shipment | ||||||
| Loading date | 15 to 18 days after receiving deposit | ||||||
| Loading port | Shenzhen or Guangzhou | ||||||
| DIMENSION |
| PROJECT IMAGE |